Monday, November 16, 2009

Test fit of post and rail


The first section of fencing for Merritt is to be assembled in the next few weeks. We have done some test fits so far. It is difficult sometimes because we have various people working and simple things like leaving too much material after a saw cut can lead to quite a bit of work paring away with your chisel.

I took a quick picture of how a post and top rail fit together. Turning the 4x4 on its edge gives natural slopes for the little roof that will be housed a top, but is a lot of work and required some angled holds while sawing and chiseling.

We should have about 16 feet installed in the next few weeks. It is really slow going, but doing it all by hand is very time consuming. It does really become a meditation while working, which is good for the soul I think.

No comments: